PIAs shall implement RPL through any of the three project types mentioned in Table below. The project types differ according to their target group.
Sl. No. | Project Type | Target Group | 5- Step RPL Process |
1 | RPL
Camps |
RPL in a location where workers of a particular sector are consolidated (such as Industrial and Traditional Clusters) |
(STEPS 2-5 to take place at a temporary RPL Camp set up by PIA within the cluster) |
2 | Employer's Premise
|
RPL on-site at an employer’s premises or a Project/ Site location where an infrastructure project is going on etc. |
(Steps 1-5 to take place within employers premises) |
3 | RPL Centers |
RPL at designated centres for geographically scattered workers who need to be mobilized.At training centres setup by Project Implementing Agencies (PIAs) with required infrastructure. |
(Steps 2-5 to take place at a designated RPL Centre within the mobilising zone) |